20. Provision of working standards, equipment etc. to the Inspector.- (1) Every Inspector shall be provided with working standards, working standard balances and such other equipment including weighing and measuring devices as may be approved by the Controller from time to time. (2) Every Inspector shall be provided with such dies, punches and such other equipments as may be necessary for affixing the verification stamp, the design and number of which are to be approved by the Controller. (3) Every Inspector shall be provided with punches of suitable sizes of eight-pointed staras shown below for obliterating stamps. |