|
| ||||||||||||
Home>>Bare Acts>>Back to Index | |||||||||||||
| |||||||||||||
SCHEDULE II Equipment to be provided with Trailer pump For light trailer pump of a capacity of 680 litres/minute - 1 Armoured suction hose of 9 meters length, with wrenches 1 Metal suction strainer 1 Basket strainer 1 Two-way suction collecting head 1 Suction adapter 10 Unlined or rubber lined 70 mm delivery hose of 25 meters length complete with quick-release couplings. 1 Dividing breaching piece 2 Branch-piece with 15 mm nozzles 1 Diffuser nozzle 1 Standpipe with black cap 1 Hydrant key 4 collapsible canvas buckets 1 Fire hook (preventor) with cutting edge 1 25 mm manila rope of 30 meters length 1 Extension ledder of 9 meters length (where necessary) 1 Heavy axe 1 Spade 1 Pick axe 1 Crowbar 1 Saw 1 Hurricane lamp 1 Electric torch 1 Pair rubber gloves For large trailer pump of capacity of 1800 Jitres/minute- 1 Armoured suction hose of 9 meters length, with wrenches 1 Metal strainer 1 Basket strainer 1 Three way suction collecting head 1 Suction adapter 14 Unlined or rubber lined 70 mm delivery hose of 25 meters length complete with quick-release couplings 1 Dividing breaching piece 1 Collecting breaching piece 4 Branch pipes with one 25 mm, two 20 mm and one diffuser nozzles 2 Standpipe with black cap 2 Hydrant key 6 Collapsible canvas buckets 1 Coiling hook (preyentor) with cutting edge 1 50 mm manila rope of 30 meters length 1 Extension ladder of 9 meters length (where necessary)
Note: If it appears to the Chief Inspector of factories that in any factory the provision of breathing apparatus is necessary he may be order in writing require the occupier to provide suitable breathing apparatus in addition to the equipment for light trailer pump or large trailer pump as the case may be. | |||||||||||||
| |||||||||||||
| |||||||||||||
| |||||||||||||
Home | Law Dictionary | Law Schools | Law Digest | Bare Acts | Disclaimer | Privacy Policy | |||||||||||||
| |||||||||||||
|
Copy right : Indu Info (All rights reserved)