Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002
 
Lawzonline.com
 
Home > Bare Acts

 

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

 

Sections

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

  
 CHAPTER XIII: EXCAVATION AND TUNNELING WORKS
153.

Ventilation

154.

Air supply intake point

155.

Emergency generators

156.

Air mains

157.

Bulk head and air-locks

158.

Diaphragms

159.

Portable electrical hand tools

160.

Circuit breaker

161.

Transformer

162.

Live wires

163.

Welding sets

164.

Quality and quantity of air

165.

Working temperature

166.

Man-locks and working in compressed air environment

167.

Safety instruction

168.

Medical lock

  
 CHAPTER XIV: CONSTRUCTION, REPAIR AND MAINTENANCE OF STEEP ROOF
169.

Work on steep roofs

170.

Construction and installation of roofing brackets

171.

Crawling boards

  
 CHAPTER XV: LADDERS AND STEP-LADDERS
172.

Construction and safe use

173.

Rungs

174.

Materials for ladders

  
 CHAPTER XVI: CATCH PLATFORM AND HOARDINGS, CHUTES, SAFETY BELTS AND NETS
175.

Catch platform

176.

Hoardings

177.

Chutes, its construction and use

178.

Safety belt and its use

179.

Safety net and its use

180.

Storage of safety belts and nets, etc

  
 CHAPTER XVII: STRUCTURAL FRAME AND FORMWORK
181.

General provision

182.

Form work, false work and shoring

183.

Erection or dismantling of steel and pre-fabricated structure

184.

Form work

185.

Deshoring

  
 CHAPTER XVIII: STACKING AND UNSTACKING
186.

Stacking and unstacking of materials and articles

187.

Stacking of cement and other material bags

  
 CHAPTER XIX: SCAFFOLD
188.

Scaffold construction

189.

Supervision by a responsible person

190.

Maintenance

191.

Standards, ledger, putlogs

192.

Working platform

193.

Board, plank and decking

194.

Repair of damaged scaffold

195.

Opening

196.

Guardrails

197.

Scaffold used by building workers of different employers

198.

Protection against electric power line

199.

Screening net and wire nets

200.

Tower scaffold

201.

Gear for suspension of scaffold

202.

Trestle scaffold and cantilever scaffold

203.

Scaffold supported by building

204.

Use of winches and climbers for suspended scaffold

205.

Safety devices for suspended scaffold

  
 CHAPTER XX: COFFERDAMS AND CAISSONS
206.

General provisions

207.

Pressure Plant and equipment

  
 CHAPTER XXI: SAFETY ORGANISATION
208.

Safety committees

209.

Safety officer

210.

Reporting of accidents

211.

Procedure for enquiry into the causes of accident or dangerous occurrence

  
 

CHAPTER XXII: EXPLOSIVES

212.

Handling of explosives

213.

Precautions

  
 

CHAPTER XXIII: PILING

214.

General provisions

215.

Stability of adjacent structure

216.

Protection of operator

217.

Instruction to and suppression of building workers working on a pile driving equipment

218.

Entry of unauthorised person

219.

Inspection and maintenance of pile-driving equipment

220.

Operation of pile-driving equipment

221.

Working platform on piling frames

222.

Pile testing

  
 

CHAPTER XXIV: MEDICAL FACILITIES

223.

Medical examination of building workers, etc

224.

Duties of construction medical officers

225.

Occupational health centres

226.

Ambulance Room

227.

Ambulance van

228.

Stretchers

 

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

Rule 1 -76 | Rule 77 - 152 | Rule 153 - 228 | Rule 229 - 299

 

 

 

 

 

Home | Law Dictionary | Law Schools | Law Digest | Bare Acts | Disclaimer |  Privacy Policy

 

 

 

     

©2008 http://www.Lawzonline.com

web hit counter