Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002
 
Lawzonline.com
 
Home > Bare Acts

 

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

 

Sections

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

  
 CHAPTER VII: LIFTING APPLIANCES AND GEAR
77.

Carrying of persons by means of lifting appliances, etc.

78.

Hoists carrying persons

79.

Attachment of loads

80.

Tower Cranes

81.

Qualification of operator of lifting winches and of signaler, etc

  
 CHAPTER VIII: RUNWAYS AND RAMPS
82.

Use of runways and ramps by building worker

83.

Use by vehicles

84.

Slope of Ramps

85.

Use by wheel barrows, etc.

  
 CHAPTER IX: WORK ON OR ADJACENT TO WATER
86.

Transport by water

87.

Prevention from drowning

  
 CHAPTER X: TRANSPORT AND EARTH MOVING EQUIPMENT
88.

Earth moving equipment and vehicles

89.

Power shovels and excavators

90.

Bulldozers

91.

Scrapers

92.

Mobile asphalt layers and finishers

93.

Pavers

94.

Road rollers

95.

General safety

  
 CHAPTER XI: CONCRETE WORK
96.

General provisions regarding use of concrete

97.

Preparation and pouring of concrete and erection of concrete structures

98.

Buckets

99.

Pipes and Pumps

100.

Mixing and pouring of concrete

101.

Concrete panels and slabs

102.

Stressed and tensioned elements

103.

Vibrators

104.

Inspection and supervision

105.

Beams, floors and roofs

106.

Stripping

107.

Reshoring

  
 CHAPTER XII: DEMOLITION
108.

Preparation

109.

Protection of adjacent structures

110.

Demolition of walls, partitions, etc

111.

Method of operation

112.

Access to floor

113.

Demolition of structural steel

114.

Storage of material or article

115.

Floor openings

116.

Inspection

117.

Warning signs, barricades, etc

118.

Mechanical method of demolition

  
 CHAPTER XIII: EXCAVATION AND TUNNELING WORKS
119.

Notification of intention to carry out excavation and tunneling work

120.

Project engineer

121.

Responsible person

122.

Warning signs and notices

123.

Register of employment etc.

124.

Illumination

125.

Stability of structure

126.

Piling, shoring and bracing

127.

Safe access

128.

Trenches

129.

Depth of trenches

130.

Positioning and use of machinery

131.

Breathing apparatus

132.

Safety measures for tunnelling operation

133.

Pneumatic tools

134.

Shafts

135.

Lift for shaft

136.

Means of communication

137.

Signals

138.

Clearances

139.

Shelters

140.

Use of internal combustion engine

141.

Inflammable oils

142.

Coupling and hoses

143.

Hose installation

144.

Fire resistant hoses

145.

Flame-proof equipment

146.

Storing of oil and fuel underground

147.

Use of gases underground

148.

Water for fire fighting

149.

Flooding

150.

Steel curtains

151.

Rest shelters

152.

Permissible limit of exposure of chemicals

 

Delhi Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2002

Rule 1 -76 | Rule 77 - 152 | Rule 153 - 228 | Rule 229 - 299

 

 

 

 

 

Home | Law Dictionary | Law Schools | Law Digest | Bare Acts | Disclaimer |  Privacy Policy

 

 

 

     

©2008 http://www.Lawzonline.com

web hit counter